This case study provides an overview of the first post-industrial building in Poland to achieve the Final certificate in the BREEAM International Refurbishment and Fit-Out (RFO) 2015 scheme.
[edit] History
CALISIA ONE is a post-industrial building in Poland that has undergone a deep modernization, revitalization and change of function. Founded by Arnold Fibiger in 1873 as a Calisia piano factory, it thrived and was a showpiece of Kalisz until 2007. Unfortunately, it lost its splendor in later years.
A local develope rdecided to bring back the building’s glory days; with the whole building undergoing reconstruction in close cooperation with the conservator of monuments. As a result of this renovation, it is a category A office space with a boutique character.
[edit] Green Strategy
One of the most important pro-ecological features of CALISIA ONE is its circularity due to the reuse of structures and foundations, as well as the recovery and reuse of some building materials. The construction was carried out in accordance with strict certification requirements, taking care both of the impact of the construction on the environment and the appropriate conditions of work standard of the employees
[edit] Achievements
[edit] Categories
|
The building has energy-efficient elevators, modern outdoor lighting and water-saving fittings. In the open courtyard, recommendations of a qualified ecologist were introduced, emphasizing the investment into nature. Moreover, the layout of the floors in the building allowed for flexible and effective arrangement of the office space.
As one of the few certified buildings in Poland, CALISIA ONE obtained the maximum score in Man 01 category. This means that the inhabitants of Kalisz had an indirect influence on project. The investor listened to all suggestions and included the most interesting proposals in the project.
[edit] Benefits of BREEAM Certification
There is no doubt that BREEAM certification requirements influenced construction workers to raise their standards and improve productivity. Water efficient fixtures have been implemented to contribute to significant water savings for the whole building.
A wonderful biodiverse garden has been designed in accordance with the requirements of the ecologist’s report. Such an approach means people and the local community can enjoy the beautiful greenery around the building.
Of the project, Marcin Antczak, Investor and Investment Initiator says, 'The awarded certificate complements our commitment and confirms that the organisation is able to implement investments according to the highest standards and requirements set by today’s real estate market.'
This article originally appeared on the BREEAM website under the headline, 'CALISIA ONE, Poland'. It was accessed in November 2020.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Planning condition discharge in England and Wales
A brief exoplanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.